After work today I went past the block to find that the under slab pipe work for the sewer connections has been done. Everything appears to be in the correct positions.
On Friday I spoke the Site Supervisor about the time-lapse camera. He had no problems with it and was going to check with the tradies to make sure they had no problems. He gave me the go ahead to set it up but if there was a tradie with a problem with it I would need to takeĀ it down.
While I was talking to him he said that I should have a Slab by the end of the week if everything goes to plan.