Today, I went past the block on the way home and found that they have put the windows in and the external doors. They have also put in the framework for the cavity sliding doors in the ensuite and walk in robe. They have also started the frame-work around the bath. Below are some picture I took while I was at the block.
Looking from the Street
Master Bedroom Window
Front Door
External door from garage into alfresco
Lounge Room Window
Kitchen Window
Bath Framework
Bedroom 3 Window
Bedroom 2 Window
Sliding Door from Dining to Alfresco
Sliding Door from Lounge to Alfresco
Looking into Alfresco
Looking into Alfresco 2
Ensuite Cavity Slider
Walk-in-Robe Cavity Slider
Ensuite Window
Bathroom Window