Today, I went into GJ Gardner and paid the initial deposit. By paying this deposit the following things can happen:
- Plans are drawn
- Soil Test and Site levels
I was told that I should have the preliminary drawings for me to check through within two weeks. Once I have checked the preliminary plans for any mistakes I should then have the final drawings within a week. having the soil test and site levels done will allow GJ Gardner to give me a fixed price contract.
The contract should be drawn up and ready a few weeks after the final plans have been received. I then have my colour consult and choose colours for everything.
Things are finally starting to move along and the house is beginning to get closer.